We completed a post about this back in 2023. As anyone who is involved in the construction industry knows prices have changed since 2023 and have only gone in one direction (yep you guessed it…up!). So we have decided to provide an updated costing for 2025. For the purpose of this pricing we have looked at a two lot subdivision (1 into 2 lots) within the Gold Coast.
One of the largest expenses associated with subdividing land is council fees. These fees can include application fees, plan sealing fees, plumbing and drainage fees, operational works and infrastructure contributions. The fees can vary depending on the level of assessment of the application and the availability of infrastructure. The City of Gold Coast application fees for a two lot subdivision are $2,024.00 (as of 08/4/2025) if code assessable and $2,342.00 if impact assessable. The fees for infrastructure connections or the like can vary significantly depending on the complexity of the works required.
Council also charges an infrastructure charge for any new allotment created in the City. This charge is not due until just prior to plan sealing. The standard charge for an additional lot is approximately (as per 08/04/2025). This fee can be reduced depending on the infrastructure provdied to a new lot. For example, if your subdivision is within a rural area of the city and no sewer connection is available the fee will reduce by approximately 33%. It is important to note that the infrastructure charge does not include any physical connections to infrastructure, the charge is essentially a tax payable by the developer that is then used for infrastructure upgrades and the like within the city.
Estimated council costs – $40,000.00 – 50,000.00
Various consultants are often involved to gain council approval for a two subdivision. At a minimum the following consultants will be involved:
A civil engineer is also often involved in subdivision application. Additional consultants can be involved depending on the complexity of the site.
Estimated Costs for Consultants – $15,00.00 – $35,000.00
The physical construction of the subdivision is where the costs can vary most significantly. This is due to the various factors that can influence the cost of establishing a two lot subdivision. In order to achieve plan sealing from Council both allotments will need to be provdied with all services and infrastructure. This includes the following at a minimum:
Water
Sewer
Stormwater
Electricity
Data
Vehicle Access (crossover and driveway)
Earthworks
Additional conditions can also be imposed by Councils such as covenant works, environmental rehabilitation, bushfire buffers, roadworks etc that all increase the costs of physically establishing the subdivision. The difficulty in pricing this stage of the process is due to the major variances from property to property. For example, should the Council sewer main be located on the opposite side of the road and a new sewerage connection is required the road may have to be cut and the connection installed. This can instantly add thousands to your costs. It is critical to engage a qualified planner to help explain some of this potential cost incurring items should you be considering a subdivision.
Estimated costs of physical works – $40,000.00 – $200,000.00
Other Costs
Other costs associated with subdividing land on the Gold Coast include financing fees (holding costs), marketing costs (real estate agents etc) and maintenance costs. These costs are unknown and will affect people differently depending on each individual’s circumstances.
Overall, it is extremely difficult to give an accurate estimate on the costs involved to undertake a 1 into 2 lot subdivision on the Gold Coast. The most significant variant when it comes to costs is the physical construction of the subdivision. A number of variables can cause a wide variance in costs.
Estimated cost for all works in total – $95,000.00 – $285,000.00.
This is an increase of approximately 20% on what was estimated in 2023.
Should you be considering undertaking a subdivision contact Align today to discuss.